How electricity flows across Europe: one hour on the grid

In the same hour, power flowed into Slovakia from Czechia and Poland and out to Hungary and Ukraine. My interactive 3D map shows what those flows can tell us and how they relate to domestic generation.

Informio··4 min read

Cover artwork for Electricity in Europe, with glowing links and coloured spheres over an outline of Europe.

About 963 MW flowed from Czechia into Slovakia. During the same hour, around 1,148 MW flowed from Slovakia into Hungary. On a map, the two arrows look like a route. Measurements at two borders cannot tell us how much electricity generated in Czechia was consumed in Hungary.

I built Electricity in Europe at Informio so readers could explore the grid in three dimensions, country by country and hour by hour. One hour in Slovakia shows why it helps to put flows, generation and load side by side.

Slovakia, 12 November 2026, 11:00–12:00 CET

The four connections shown on the map recorded these hourly average physical flows:

  • Into Slovakia: 963.25 MW from Czechia and 417 MW from Poland.
  • Out of Slovakia: 1,148.25 MW to Hungary and 43 MW to Ukraine.

Subtract the outward flow (1,191.25 MW) from the inward flow (1,380.25 MW) and you get a net flow of 189 MW into Slovakia. The balance is much smaller than the largest arrow. It describes these four connections in this one hour. The figures come from the weekly physical flow series for Slovakia.

For the same hour, the generation and load series show a load of 3,747 MW and around 3,450 MW of reported domestic generation, including 2,432 MW of nuclear power. Nuclear accounted for about 70.5% of reported generation. The denominator is the sum of the reported generation sources, rather than the load. This figure cannot tell us the nuclear share of electricity consumed in Slovakia.

Try to close the balance: 3,449.5 MW of reported generation + 189 MW of net inflow = 3,638.5 MW. That is 108.5 MW below the reported load. We cannot attribute that gap to losses. Closing the balance would require complete and consistently defined measurements of generation, demand, flows and storage.

Why an arrow is not a trading route

In an interconnected AC grid, power can split across several lines. The split depends on the network layout, the electrical characteristics of the lines, generation and demand. A shift in where electricity is generated within one country can change a flow across its border. In its analysis of unscheduled flows, ACER documents cases where measured flows differ from those anticipated from commercial exchanges.

Each arrow on the map answers a narrow question: what was the average physical flow across this connection in the selected hour, and in which direction? One line can represent more than one circuit. The country positions are schematic.

How to read the spheres, colours and megawatts

The size of a sphere represents grid load, including losses. The colours inside show the shares of reported domestic generation: nuclear, hydro, wind, solar, fossil fuels, bioenergy and other sources. Double-click a country for the breakdown in MW and percentages. Imports are outside that calculation.

A megawatt (MW) measures power; a megawatt-hour (MWh) measures energy. At an average power of 800 MW for a quarter of an hour, 200 MWh of energy is transferred. The map uses hourly averages. If a flow reverses within the hour, the average can be small even when substantial power flowed in both directions.

Check the measurement time before comparing

Flows and load use the same hour. If the selected hour lacks a complete generation mix, the map can show the most recent complete mix from an earlier hour and labels it with its own timestamp. I leave missing measurements unavailable rather than filling them with zeroes or estimates. Source data are published with a delay, and coverage varies by country. Refreshing the page does not give you a reading for this minute.

The visualisation uses data from Energy-Charts.info (Fraunhofer ISE), including measurements from the ENTSO-E Transparency Platform. The example uses hourly averages and calculations from the linked series. Source data: Energy-Charts.info, CC BY 4.0.

Compare two hours at the same border

Open the Electricity in Europe map, select Slovakia and use the 24 h button to open the timeline. Follow one connection in two different hours. Then open the generation breakdown for both hours and check the timestamp of the mix. You can see whether the direction or size of the flow changed, or whether the difference is simply in the data available. If you spot something interesting, note the measurement hour. Once it drops off the timeline, you can still check the figures in the weekly source series.